![]() |
|||||||||||||||||||||||||
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|||||||||||||||||||||||||
An efficient and economical geothermal power plant requires appropriate and optimal use of its geothermal resource. Adequate testing of the geothermal resource to determine the character of the geothermal fluid (steam and/or brine) that will be delivered on a sustained basis, is a prime prerequisite. GDA will work with new project developers to obtain the data required for the proper power plant design and its estimated cost. Below are typical power plant configurations with information regarding the power cycle and generalized geothermal resource requirements. Click on the links below for more information and full-size illustrations. Power Plant Configurations Power Plant Layouts There are basic major components in a geothermal power plant, such as the turbine, generator, gearbox, cooling system, lubrication system and electrical systems. The following .PDF files depict plan, elevation and isometric views of four single-flash plant configurations similar to those supplied by GDA for the Lihir Gold Mine Ltd. mine and processing plant operations, Papua New Guinea. In these examples, General Electric CL-55 turbines were specified in both non-condensing and condensing configurations.
|
|||||||||||||||||||||||||
© Geothermal Development Associates | 770 Smithridge Dr. Suite 550 - Reno, NV 89502 USA | Ph. +1 (775) 825-5800 | Fax +1 (775) 825-4880
Design by D4 WebDesign |
|||||||||||||||||||||||||