Gold company Lihir Gold Limited is turning its vast geothermal resource into an opportunity. In April, the company started commissioning a 6MW geothermal power station, the first in Papua New Guinea to use natural geothermal energy for the generation of electricity. Based on last year's spending on heavy fuel, we expect to save over US$2-million a year following the commissioning of the geothermal power station."
GDA scope of work comprised plant design, plant component subcontracting, expediting, inspections and testing, assembly, overland shipment to US ports, and insurance, performance guarantee and warranty. The GDA plant supply scope of supply included on steam turbine and turbine accessories, including steam turbine, steam inlet piping assembly, hydraulic oil system, control and instrumentation, turbine skid; generator and generator accessories, including generator, exciter, main terminal box and generator skid; speed reduction gear; lube oil console; switchgear and controls, including switchgear, control panel, motor control center, battery and battery charger, and motors; control building, including control building electrical wiring responsibilities; shop assembly and preparation for shipment; design and supervision; and inspections and testing. A compact lube oil console was designed solely by GDA. It provides lubricating oil for the turbine generator set during both normal operation and in an emergency shutdown situation. The console features AC & DC motors, a centrifuge, a 300 US gallon reservoir, and manual/automatic control system components.
GDA assembled and wired a remote control panel (shown in left picture below). The primary features of the panel are a Quantum PLC, a Woodward electronic governor, a Multilin generator protective relay, and an excitation control system. In addition to the turbine generator set, the PLC controls and/or monitors the gearbox, lube & hydraulic oils, cooling water, and steam valves/lines. Manual control of some systems is allowed at junction boxes mounted on or near the equipment. GDA assembled and wired a remote control panel. The primary features of the panel are a Quantum PLC, a Woodward electronic governor, a Multilin generator protective relay, and an excitation control system. In addition to the turbine generator set, the PLC controls and/or monitors the gearbox, lube & hydraulic oils, cooling water, and steam valves/lines. Manual control of some systems is allowed at junction boxes mounted on or near the equipment. The picture on the right above shows a close-up of the electronic governor, which allows automatic or manual control of plant synchronization to the local utility lines. The screen shows the turbine-generator operating at its design performance of 6000kW. The Lihir steam turbine began as an unused, low pressure CL-55, originally manufactured for military marine duty. It was modified for geothermal power generation by GE Energy. In this picture, there is an insulation blanket over the top of the turbine. The silver wrapped piping transports the inlet steam from the geothermal wellfield. On the left side of the picture, the speed reducing gear that connects the synchronous generator and turbine is barely visible. A gauge board for monitoring turbine pressure and temperature is shown on the right.
|
|||||
© Geothermal Development Associates | 770 Smithridge Dr. Suite 550 - Reno, NV 89502 USA | Ph. +1 (775) 825-5800 | Fax +1 (775) 825-4880
Web Design by D4 Web Design |
|||||