30MW Single Flash Power Plant and 20 MW Expansion Project In December, 2003, Lihir Management Company awarded GDA a contract for supply and site supervision for a 30MW (net) geothermal power plant. In 2005, Lihir contracted with GDA for an additional 20 MW of plant equipment. The picture at the left shows the main power house and annex GDA mechanical and electrical engineers were on-site for the supervision of plant off-loading in nearby Luise Harbor. The engineers rotated on a regular basis, supervising plant erection, testing, startup, and commissioning. GDA engineers take every opportunity to interact with site personnel to pass on their knowledge, as well as conduct formal training. The GDA plant supply scope included three steam turbine generator sets delivered FAS port USA, engineering design and project management, a spare turbine with accessories, generators and accessories, speed reduction gears, lube oil consoles, main condensers and auxiliaries, cooling water system pumps, gas extraction equipment, cooling tower, spare parts and special tools. The picture gallery below depicts some of the equipment and systems during erection of the Lihir 30 MW plant. GDA supplied all the pictured equipment and either managed the design through subcontractors or generated unique designs. Pictures also show the Lihir Gold Mine processing plant and Luise Harbor. Picture Gallery
|
|||||||||||||||||||||||||||||||||||||||||
© Geothermal Development Associates | 770 Smithridge Dr. Suite 550 - Reno, NV 89502 USA | Ph. +1 (775) 825-5800 | Fax +1 (775) 825-4880
Web Design by D4 Web Design |
|||||||||||||||||||||||||||||||||||||||||