30MW Single Flash Power Plant and 20 MW Expansion Project
Lihir Island, Papua New Guinea - 2005

In December, 2003, Lihir Management Company awarded GDA a contract for supply and site supervision for a 30MW (net) geothermal power plant.  In 2005, Lihir contracted with GDA for an additional 20 MW of plant equipment.

The picture at the left shows the main power house and annex under construction.  The power house is the larger open section which houses three 10 MW turbine-generator sets with their associated condensers and gas extraction systems.  The smaller attached annex houses the electrical equipment, including the motor control centers, batteries, switchgear, and transformers on the first floor; and the control room and office facilities on the second floor.

GDA mechanical and electrical engineers were on-site for the supervision of plant off-loading in nearby Luise Harbor.  The engineers rotated on a regular basis, supervising plant erection, testing, startup, and commissioning.  GDA engineers take every opportunity to interact with site personnel to pass on their knowledge, as well as conduct formal training.

The GDA plant supply scope included three steam turbine generator sets delivered FAS port USA, engineering design and project management, a spare turbine with accessories, generators and accessories, speed reduction gears, lube oil consoles, main condensers and auxiliaries, cooling water system pumps, gas extraction equipment, cooling tower, spare parts and special tools.

The picture gallery below depicts some of the equipment and systems during erection of the Lihir 30 MW plant.  GDA supplied all the pictured equipment and either managed the design through subcontractors or generated unique designs.  Pictures also show the Lihir Gold Mine processing plant and Luise Harbor. 

Picture Gallery

TG_LO_small.jpg (1981 bytes)
TG Set & LOC
TGinAir_small.jpg (2024 bytes)
Turbine & Gearbox
Bird_Eye_small.jpg (2222 bytes)
TG Set from above
PH_Inside_small.jpg (2123 bytes)
Powerhouse Interior
CT_TopMerge_small.jpg (1451 bytes)
Cooling Tower Top
CT_Frame_small.jpg (1830 bytes)
Cooling Tower Frame
Stack_small.JPG (1840 bytes)
Cooling Tower Fan Stack
PH_End_small.jpg (2309 bytes)
Powerhouse from side
Actuators_small.jpg (2115 bytes)
Steam Valve Actuators
Actuator_Cntrl_small.jpg (2287 bytes)
Steam Valve Controls
Bay_small.jpg (1938 bytes)
Lihir Bay from afar
Bay2_small.jpg (2088 bytes)
Lihir Bay close-up
Gas_Extract_small.jpg (2222 bytes)
Gas Extraction Equipment
Jet_small.jpg (1985 bytes)
Cooling Water Pump
LOC_small.jpg (1792 bytes)
Lube Oil Console
LOC_small.jpg (1792 bytes)
Lube Oil Coolers